
Rubber Recycling EPT for Making Rubber PowEPT1~120meshRubber Recycling EPT for Creating Rubber PowEPT1~120mesh500kg solHour
one period of time Single Hook DebeaEPTLSJ-1200
Structural features
The blade of cutter is manufactured of alloy welding and the area is challenging put on-resisting period of time
On basic safety element comma this EPT have protective body comma which can properly assure safety in the method of pulling out wire loop period
Motor and EPT comma and as a EPT comma the construction is compact period
The EPT occupies the EPT ground comma convenient set up period
Use colon
Pulling out the wire loops from the mouth of squander tires period
2 period Tire Cutter QDJ-1200
The basic basic principle is colon motor drives hydraulic technique and the cylinder comma location the tire to lock arm comma fasten two blades rotating in between tire and shear cylinders perform to go comma two blades rotating blades forming shear comma achieve the impact of shear time period
Attribute colon
This tools comma great shear result comma shearing pace comma reduced power intake comma modest quantity comma convenient comma simply because use the hydraulic method comma easy procedure and secure interval
Mechanical description colon the tires more than 800 need to minimize comma and cut into four pieces in EPT periodthe size of piece is 200-500mm period of time
Notes for using tire cutter colon
a period of time Examine the knives regularly comma if look evident blunt comma it ought to be sustain timely comma and the provider is 2-3 a long time interval
b period of time the oil in hydraulic station must be filtered and modified often interval EPTly filter after each one and 50 % 12 months interval
c period of time Putting on components colon rubber seals comma shipped with another set when ship the EPT to the purchaser time period
three amp4 period EPT tire shredEPTZPS-900
Use colon
This EPT can immediately crush tires more compact than 800mm tires period At the EPT temperature comma can be place right crushed into 50 ast fifty mm block comma so the up coming rotating can grind into 10-30 meshes or wire and fiber separation products period
Attribute colon
This EPT is a compact structure comma advanced engineering comma minimal energy consumption comma large effectiveness comma smashing off the examination place for the construction comma upkeep is particularly handy semi instruments with carbide surfacing engineering comma higher hardness comma large use resistance comma and repeated restore making use of comma so has a EPTer support existence semi rotary display for the lattice construction of metal mesh comma blanking large location comma enabling the screening of competent rubber interval Following the partition of huge tires can obtain the influence of the same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can straight be damaged into 50 ast50 mm of rubber block period of time
Notes for utilizing EPT tire shredder colon
a period of time Inject equipment oil into EPT oil lparhypoid equipment oil rpar comma principal bearings use calcium-based mostly grease lubrication comma 3 months soon after the operation of the EPT comma the oil need to be changed and clean the gas tank period of time Considering that then adjust the oil after time every year period
b After deal with three comma000 tons of waste rubber lparin regular conditions rpar commathe purchaser must grind the blade cutting edge after time time period The blades is the put on elements comma the EPT services lifestyle is five-6 many years comma when providing the EPT to the customer comma the shredEPTwill be geared up with edge hardness layer patching content lparelectrodes rpar interval
5 interval Double Rolls Rubber Crusher XKP-560
Use colon
Primarily employed for crack massive rubber blocks into forty-50mm small rubber blocks period of time
Complex parameters colon
Construction colon The rollers undertake alloy cold challenging solid irons with use-resisting comma resilient figures period The mill flour is with enamel comma high groove time period
In orEPTto extend the services life of the cracker comma we recommend construct foundations for rubber cracker time period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and difficult gear area EPT with lower sounds and EPTer services lifestyle time period
5Our crackers are made XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with great running platforms comma all the wires will be related well from managing system to motor time period When using the EPT comma the customers just want to hook up straight to the EPT time period
Large Output Rubber Tire Recycling Plant comma Waste Tire Recycling Plant 500kg solHour
| No period | Title | Design | Qty interval lparQty rpar |
Motor EPT lparKW rpar | ||
| one | Solitary hook debeader | LSJ-1200 | 1 | 11 | ||
| two | EPT tyre cutter | QDJ-1200 | one | 5 period5 | ||
| three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | sixty one period5 | ||
| 5 | Double Rolls Rubber Crusher | XKP560 | one | ninety | ||
| 6 | Large conveyor products | BCL-8 | 1 | 2 | ||
| seven | Modest conveyor tools | BCL-three | 1 | 1 period1 | ||
| eight | Big Magnet separator | BMS22 | one | two period2 | ||
| nine | Small Magnet separator | SMS-1 | 1 | 1 period1 | ||
| ten | Massive Shaking screen | BSS-eight | 1 | 7 period5 | ||
| 11 | Modest Shaking monitor | SSS-3 | 1 | 3 | ||
| twelve | Fiber separator | FS110 | one | five period5 | ||
| thirteen | Good Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
| Square vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | one | seven period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | one | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | 1 period5cbm | one | ||||
| Hopper | one | |||||
| Belt conveyer | one | period75 | ||||
| fourteen | Steel Baller EPT | 30T | 1 | 7 period5 | ||
| fifteen | Rubber powder EPT EPT | 1 | three | |||
| 24 | 334 period4KW | |||||
Rubber Recycling EPT for Producing Rubber PowEPT1~120mesh

